![]() If I have one lot that fails acceptance sampling and I am trying to bound the issue is it suitable to bound it to the one affected lot if the lot before and after pass or do I need to carry out additional sampling. We do not uses switching rules as we have always found them too difficult to manage. ![]() We have an acceptance sampling inspection in place where we use the ANSI/ASQ Z1.4 -2013 standard under Normal Inspection, using General Inspection Level II to drive our samples size and accept, reject criteria.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |